Teradyne has launched Iris 100 for production microLED optical testing. The platform measures individual emitters across large arrays and combines optical characterisation with UltraFLEXplus electrical test infrastructure.
ITRI has unveiled a 3.2Tbps silicon-photonics engine for AI networks. The design doubles its previous 1.6T generation while more than 20 partners develop supporting design, fabrication, test and packaging capability.
Lumentum has developed an eight-wavelength laser source for AI optics. The pluggable DWDM module delivers up to 24dBm per wavelength while targeting serviceable external illumination for co-packaged and near-packaged optical systems.
Molex has introduced VersaBeam Mini for denser AI optical links. The 16-fibre expanded-beam connector fits a 3.5 x 9mm footprint, supports up to 3,456 fibres per 1RU and enters limited sampling in Q4 2026.
ams OSRAM has demonstrated 32Gbps thin-film VCSEL arrays for AI. The 850nm platform uses addressable 25µm-pitch emitters, silicon TSV integration and a highly parallel architecture designed to reduce optical interconnect energy.
SEALSQ plans a Swiss centre for post-quantum semiconductor personalisation capabilities. The CHF40–60 million Jura proposal covers secure provisioning, testing, certification and potential ASIC design, with more than 250 direct jobs targeted by year eight.
imec has demonstrated a 400Gbps optical link using low-voltage APDs. The 300mm silicon photonics device combines 100GHz bandwidth, 5V operation and internal gain while improving receiver sensitivity by 3dB.
SCL has launched an indigenous execution system for fab automation. DMIS covers semiconductor production from order booking and wafer fabrication through final packaging and shop-floor control.
AI packaging is moving beyond established CoWoS-S interposer limits now. TrendForce expects CoWoS-L to remain the mainstream approach through 2028 as accelerator packages add compute dies and HBM.
Dnotitia has received first silicon for its dedicated vector processor. Chip-level characterisation is under way before planned ASIC system evaluations during the fourth quarter.